Our List of Projects

S.No. Project Title Type of Project
11 NH-162 starting from Charbuja, connecting Kumbalgarh, Haldigathi, Nathwara, Mavli and terminating at Bhatever on NH-27 in...
  • Pavement Evaluvation Studies

  • Length : 150 km
DPR/ Feasibility
10 Preparation of DPR for Upgradation of Selected Road Stretches under State Road Improvement Program (SRIP) - Package I in...
  • Pavement Evaluvation Studies

  • Length : 117km
DPR/ Feasibility
9 Preparation of DPR for Upgradation of Selected Road Stretches under State Road Improvement Program (SRIP) - Package II in...
  • Pavement Evaluvation Studies

  • Length : 151 km
DPR/ Feasibility
8 DPR preparation for Upgradation of Road Corridors Package IIIB on DBFOT Basis in Punjab State No. of Roads: 3
  • Pavement Analysis & Design

  • Length : 177 km
DPR/ Feasibility
7 DPR preparation for Upgradation of Road Corridors Package IIIA on DBFOT Basis in Punjab State No. of Roads: 3
  • Pavement Analysis & Design

  • Length : 123 km
DPR/ Feasibility
6 Preparation of Detailed Project Report and Engineering Design for Thrissur City Road Improvement Project in the state of...
  • Pavement Evaluvation Studies

  • Length : 46 km
DPR/ Feasibility
5 Four-laning of Sidhi-Singrauli on NH-75E from km 84/300 to km 196/000 in the state of Madhya Pradesh
  • Laboratory Testing

  • Length : 112 km
Detailed Engineering (DBFOT)
4 Pre-tendering Services of "Operation, Maintenance & Transfer (OMT) of 4 Lane/ 6 lane Projects" in the state of Maharastra,...
  • Pavement Analysis & Design

  • Length : 1100 km
Pre-Tendering (O&M)
3 Two Laning with Paved Shoulder of Bikaner-Suratgarh section of NH-15 in the state of Rajasthan
  • Pavement Analysis & Design

  • Length : 173 km
Detailed Engineering (DBFOT)
2 Six Laning of Jaipur Ring Road from Ajmer Road to Agra Road Section at Jaipur in the State of Rajasthan
  • Pavement Analysis & Design

  • Length : 47 km
Detailed Engineering (DBFOT)
1 Four Laning of Patna-Buxar Section of NH-30 & NH-84 in the State of Bihar
  • Pavement Analysis & Design

  • Length : 125 km
Detailed Engineering (BOT)

Projects Contribution

Overview

Project Description Length (km) Percentage
Detailed Engineering (BOT/ DBFOT/ EPC) 2,808 15.13%
DPR/ Feasibility 5,759 31.04%
Tech Due Diligence (TDD) 3,764 20.28%
Toll Operate Transfer (TOT) 853 4.6%
Operation & Maintenance (O&M) 350 1.89%
Asset Management System 800 4.31%
Pre-Tendering (EPC/BOT/DBFOT/Hybrid) 2,517 13.56%
Pre-Tendering (TOT) 605 3.26%
Pre-Tendering (O&M) 1,100 5.93%
Total Length (km) 18556 100%
Projects Contribution Overview

State wise Projects

S.No. State Length (km) Percentage (%)
1 Telangana 1,258 6.78%
2 Andhra Pradesh 2,783 15%
3 Tamil Nadu 1,011 5.45%
4 Karnataka 1,768 9.53%
5 Kerala 781 4.21%
6 Maharastra 1,934 10.42%
7 Odhisa 977 5.27%
8 Jarkhand 286 1.54%
9 West Bengal 527 2.84%
10 Bihar 254 1.37%
11 Madhya Pradesh 1,313 7.08%
12 Uttara Pradesh 1,253 6.75%
13 Assam 77 0.41%
14 Meghalaya 49 0.26%
15 Uttarakhand 539 2.9%
16 Haryana 261 1.41%
17 Punjab 359 1.93%
18 Rajasthan 1,465 7.89%
19 Gujarath 746 4.02%
20 Jammu & Kashmir 43 0.23%
21 Arunachal Pradesh 64 0.34%
22 New Delhi 8 0.05%
23 Himachala Pradesh 800 4.31%
Total Length (km) 18556 100%
Projects Contribution State Wise