Project image

Our Projects

Project DescriptionLength (km)Percentage
Tech Due Diligence (TDD) - All1623.024.5%
Project Management Consultancy (PMC)1185.863.3%
Technical Valuation Study (TVS)812.862.2%
Detailed Engineering (BOT/ DBFOT/ EPC)441212.1%
Road Safety Audit (Detailed Design)230.1%
DPR/ Feasibility614216.9%
Tech Due Diligence (TDD) - Investigations1300035.8%
Toll Operate Transfer (TOT)23106.4%
Operation & Maintenance (O&M)18275%
Asset Management System8002.2%
Pre-Tendering (EPC/BOT/DBFOT/Hybrid)25176.9%
Pre-Tendering (TOT)6051.7%
Pre-Tendering (O&M)11003%
Total Length (km)36,358100%

Delivered 350+ projects, spanning 25 states and over 36,358 km,

Creating a significant nationwide impact.

eclat engineering cover 25+ states

Projects on Glance

Project image

Eclat Engineering Consultants: Projects Contribution (Total Length = 36,358 km) as on 22nd Dec 2023

  • Tech Due Diligence (TDD) - Investigations
  • DPR/ Feasibility
  • Road Safety Audit (Detailed Design)
  • Detailed Engineering (BOT/ DBFOT/ EPC)
  • Technical Valuation Study (TVS)
  • Project Management Consultancy (PMC)
  • Tech Due Diligence (TDD) - All
  • Pre-Tendering (O&M)
  • Pre-Tendering (TOT)
  • Pre-Tendering (EPC/BOT/DBFOT/Hybrid)
  • Asset Management System
  • Operation & Maintenance (O&M)
  • Toll Operate Transfer (TOT)